Case Studies
Client: With this project we were contracted to relocate an existing modular building owned by the Trust and refurbish it for use as a “Walk-In” centre. The building was dismantled and loaded onto vehicles by our "on-site team" and transported back to our factory in Hull, were each module under went various alterations and general refurbishment. Meanwhile on site Dennis Waller was project managing the redevelopment of the site ready for the new Walk-in centre, which consisted of:
Installed:
Completed:
General Description:



















